Bellway Homes & Miller Homes

Merlin Way, Hartlepool

Aerial view of the completed Merlin Way roundabout in Hartlepool

Project Overview

Vista Civil Engineering widened the existing highway and added lanes at Merlin Way roundabout to increase junction capacity and improve traffic flow. The team planned and phased the works around traffic management measures to maintain access and minimise disruption. Additional works for Hartlepool Borough Council included new bollards and signs, full-width carriageway resurfacing and refreshed road markings, improving safety and traffic flow across the junction.

DELIVERED ON A LUMP SUM, FIXED COST BASIS

ONGOING LIAISON WITH THE COMMUNITY

£0 EXTRAS CHARGED TO THE CLIENT

COLLABORATION WITH ADOPTING AUTHORITY

8 WEEK PROJECT DURATION

IMMEDIATE SIGN-OFF

Works Involved

• Implemented extensive traffic management to maintain traffic flow and deliver the works safely.

• Diverted the high-voltage (HV) electrical network to facilitate carriageway widening.

• Removed existing highway drainage and installed new drainage infrastructure.

• Removed, replaced and relocated illuminated and non-illuminated traffic signs.

• Relocated street lighting columns to suit the revised highway layout.

• Reconstructed carriageway islands to change the layout of two junction approaches.

• Installed reflective bollards in the new carriageway islands.

• Reconstructed existing footways.

• Completed full-depth carriageway construction and resurfacing.

• Removed and reinstated road markings to suit the revised highway layout.

BEFORE

AFTER

Site Challenges

While excavating for full-depth carriageway construction, the site team uncovered a live high-voltage cable that conflicted with the proposed widening. The cable had to be lowered to achieve the required pavement construction depth. As the road was fully closed, any delay risked extending the closure and increasing disruption.

Vista coordinated with Hartlepool Borough Council and Northern Powergrid to assess the issue, agree an engineering solution and secure the necessary approvals. Through joint planning, regular stakeholder meetings and programme management, the team prioritised the diversion and lowered the cable within the scheduled closure, allowing construction to continue to the required highway specification.

The remaining widening, surfacing and associated works were completed within two weeks of the diversion, allowing the junction to reopen as planned.

Authority Testimonial

Client Testimonial

I would like to thank Vista for delivering another Section 278 project within the Borough of Hartlepool.

Vista have been very professional to ensure that the works were carried out in the specified time limit! Always providing updates on the progress of the works, friendly and informative!

I look forward to work with Vista again!

Asset Management Co-ordinator, Hartlepool Borough Council

Vista Civil Engineering delivered the roundabout improvement works at Merlin Way professionally, provided updates throughout the project and removed the burden.

Their proactive communication with Hartlepool Borough Council and other stakeholders ensured the works were delivered safely and with minimal disruption. When an unforeseen live high-voltage cable was identified during construction, Vista worked quickly with the relevant parties to agree and deliver a solution, keeping the programme on track and most importantly, within budget.

The project received immediate sign-off and we were very pleased with Vista’s approach plus the overall high standard delivery of the works.

Senior Engineer, Miller Homes (Teesside)

Local Authority Testimonial

Authority Testimonial

“‘I recently had the pleasure of working with Vista Civil Engineering on a challenging Section 278 project, and I must say that their level of expertise and service is second to none. From the initial consultation to the project's completion, their team demonstrated a remarkable commitment to delivering exceptional results.
‍
The project involved the implementation of Section 278 works to a legacy residential estate. Vista were not only highly knowledgeable but also displayed a deep understanding of highway adoption works. Their ability to navigate the con-straints of the project ensured that the works were completed smoothly.
‍
Throughout the project, the team maintained clear and open lines of communication. They were responsive to our questions and concerns and provided regular updates on the project's progress.
‍
The completed highway works met our expectations in terms of functionality, safety, and durability. It's evident that Vista takes pride in their work and is committed to delivering projects that stand the test of time.
‍
I highly recommend Vista to anyone seeking a company that combines exceptional expertise, transparent communica-tion, and a commitment to sustainable and high-quality Section 278 delivery. I look forward to working with them again in the future.”

Mahesh Ganeshan—London Borough of Sutton