Bellway Homes & Miller Homes

Hart Lane, Hartlepool

Project Overview

This project involved the removal of existing road markings and the installation of new road markings to support amendments to the road layout. The updated layout was designed to improve traffic flow, safety, and clarity for all road users. In addition to the revised markings, new traffic signage was installed to clearly communicate the changes and guide road users effectively through the updated arrangement. The combined measures ensure that the modified road layout is intuitive, compliant with relevant standards, and enhances overall road safety.

DELIVERED ON A LUMP SUM, FIXED COST BASIS

CONTINUOUS LIAISONS WITH COMMUNITY

£0 EXTRAS CHARGED TO THE CLIENT

COLLABORATION WITH ADOPTING AUTHORITY

ONE WEEK PROJECT DURATION

IMMEDIATE SIGN OFF

Works Involved

• Temporary traffic management implemented.

• Removal of existing road markings.

• Installation of new road markings.

• Installation of new non-illuminated signage.

BEFORE

AFTER

Site Challenges

A key challenge associated with this project was the constrained nature of the roundabout. The limited space required careful planning and precise execution to safely remove existing road markings and install the new layout. The tight geometry also restricted vehicle movements and working areas, necessitating effective traffic management to minimise disruption while maintaining safety for both road users and the workforce.

Authority Testimonial

Client Testimonial

Further to our site meeting regarding the works carried out at Hart Lane roundabout. I can confirm that the works carried out are to a satisfactory standard and this section of Section 278 works for Upper Middle Warren is now complete!


Asset Management Co-ordinator
Hartlepool Borough Council

Local Authority Testimonial

Authority Testimonial

“‘I recently had the pleasure of working with Vista Civil Engineering on a challenging Section 278 project, and I must say that their level of expertise and service is second to none. From the initial consultation to the project's completion, their team demonstrated a remarkable commitment to delivering exceptional results.

The project involved the implementation of Section 278 works to a legacy residential estate. Vista were not only highly knowledgeable but also displayed a deep understanding of highway adoption works. Their ability to navigate the con-straints of the project ensured that the works were completed smoothly.

Throughout the project, the team maintained clear and open lines of communication. They were responsive to our questions and concerns and provided regular updates on the project's progress.

The completed highway works met our expectations in terms of functionality, safety, and durability. It's evident that Vista takes pride in their work and is committed to delivering projects that stand the test of time.

I highly recommend Vista to anyone seeking a company that combines exceptional expertise, transparent communica-tion, and a commitment to sustainable and high-quality Section 278 delivery. I look forward to working with them again in the future.”

Mahesh Ganeshan—London Borough of Sutton