St. Modwen

Carnation Way, Nine Elms

Project Overview

Section 278 infrastructure scheme progressed straight to adoption with the London Borough of Wandsworth. The project involved extensive coordination with Transport for London and stakeholders to ensure seamless delivery. A robust traffic management plan maintained safe vehicle, pedestrian, and bus movement, while the carriageway was fully resurfaced and marked within a live road environment, overcoming significant logistical and safety challenges.

DELIVERED ON A LUMP SUM, FIXED COST BASIS

EXTENSIVE THIRD PARTY MANAGEMENT

£0 EXTRAS CHARGED TO THE CLIENT

COLLABORATION WITH ADOPTING AUTHORITY

6 WEEK PROJECT DURATION

IMMEDIATE SIGN-OFF

Certification

MAINTENANCE NEGOTIATED

ADOPTION ACHIEVED 03-12-2024

Works Involved

  • Extensive liaison with Transport for London, and various third party stakeholders.
  • Implementation of traffic management and diversion routes through London.
  • Highway drainage length repairs and CCTV survey.
  • Street lighting column installation, LV connection and testing.
  • Reconstruction of footway inclusive of kerb lines and flagged paving.
  • Construction of pedestrian tactile crossing points.
  • Installation of reflective signage and bollards.
  • Replacement and adjustment of all ironwork within the carriageway.
  • Plane off, regulating and final surface course installation including road markings to the carriageway.

BEFORE

AFTER

Site Challenges

The project required extensive coordination with Transport for London and multiple third-party stakeholders to ensure effective communication and seamless delivery at every stage of the scheme.

A comprehensive traffic management plan was implemented, incorporating clearly defined diversion routes to maintain the safe and efficient movement of vehicles, pedestrians, and public transport users throughout the site.

The carriageway works included a full plane off, regulation, and final surface course replacement, followed by the installation of new road markings to reflect the updated layout. Completing these operations within a live road environment presented significant logistical and safety challenges.

Authority Testimonial

Client Testimonial

This project was a 7-year old, part complete, legacy Section 278 scheme that had come to a halt. Once we brought Vista on board, we were able to discharge an overdue bond and significantly reduce our liability for further damage repair. Vista successfully installed a compliant and safer road junction for pedestrians, cyclists, and vehicles.

What stood out most was the direct, hands-on approach from the Vista team. Their expertise and ability to take the hassle out of S278 legacy highway adoptions allowed me to focus on my core responsibilities, which was one of the key benefits of the service.

The quality of work was outstanding, with Vista solving any design or detail challenges that arose, without requiring my involvement.

Senior Construction Manager

St Modwen

Local Authority Testimonial

Authority Testimonial

“‘I recently had the pleasure of working with Vista Civil Engineering on a challenging Section 278 project, and I must say that their level of expertise and service is second to none. From the initial consultation to the project's completion, their team demonstrated a remarkable commitment to delivering exceptional results.

The project involved the implementation of Section 278 works to a legacy residential estate. Vista were not only highly knowledgeable but also displayed a deep understanding of highway adoption works. Their ability to navigate the con-straints of the project ensured that the works were completed smoothly.

Throughout the project, the team maintained clear and open lines of communication. They were responsive to our questions and concerns and provided regular updates on the project's progress.

The completed highway works met our expectations in terms of functionality, safety, and durability. It's evident that Vista takes pride in their work and is committed to delivering projects that stand the test of time.

I highly recommend Vista to anyone seeking a company that combines exceptional expertise, transparent communica-tion, and a commitment to sustainable and high-quality Section 278 delivery. I look forward to working with them again in the future.”

Mahesh Ganeshan—London Borough of Sutton

Contact

Email
info@vista-civils.co.uk

Phone
0330 165 7989
Office
Vista Civil Engineering
International House
45-55 Commercial Street
London
E1 6BD
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.