Bambridge Road
Cambridge Road, Barkway

Project Overview
Delivered a temporary construction access for a new Barratt Redrow housing development on a busy B-road serving Barkway. The project required carefully managed traffic and pedestrian movements, with a lane closure, two-way temporary traffic signals, and a signed pedestrian diversion implemented to maintain safe access throughout the works. The scheme was delivered safely, on programme, and achieved first-time approval from Hertfordshire County Council.
DELIVERED ON A LUMP SUM, FIXED COST BASIS
COMPLEX TRAFFIC MANAGEMENT
£0 EXTRAS CHARGED TO THE CLIENT
COLLABORATION WITH ADOPTING AUTHORITY AND CLIENT
4 WEEK PROJECT DURATION
IMMEDIATE SIGN-OFF
Works Involved
• Implemented extensive traffic management, including two-way temporary traffic signals and a signed pedestrian diversion.
• Excavated and cut the existing grass verge to formation level.
• Installed a foul drainage manhole and associated drainage beneath the temporary access.
• Installed utility ducting to accommodate future service connections.
• Replaced existing non-illuminated highway signage.
• Full depth carriageway and footway construction, including tactile crossing point.
• Grass verge reconstruction.
• Applied new road markings to reflect the revised highway layout.

BEFORE

AFTER
Site Challenges
Working on a busy B-road serving Barkway required careful planning to maintain the safe movement of both vehicles and pedestrians throughout the works. A signed footway diversion was implemented to provide a safe working environment, particularly during surfacing operations when pedestrian movements required close management. A continuous site presence ensured the diversion remained safe, clearly signed, and accessible at all times.
During excavation, the existing carriageway construction was found to differ from the original design assumptions. Vista worked closely with Hertfordshire County Council to develop an alternative tie-in detail. This collaborative approach avoided unnecessary excavation, minimised disruption, reduced programme risk, and enabled the scheme to be completed on time and within budget.
Authority Testimonial
Client Testimonial
Vista was engaged to deliver a temporary construction access as quickly as possible, as no other contractor was prepared to start the works within the required timeframe. Vista mobilised quickly and delivered the access to programme, with the works subsequently signed off by Hertfordshire Highways.
Throughout the project, Vista provided regular updates on the programme and feedback from Highways, ensuring clear and consistent communication. The key benefits included being able to move onto site quickly, keeping the access works separate from the principal contractor’s activities, and providing safe access and egress to the site.
We would fully recommend Vista. The team were professional and highly responsive, with communication rated 10/10 and a good standard of workmanship on site.
Matthew Moore - Senior Technical Manager
Local Authority Testimonial
Authority Testimonial
“‘I recently had the pleasure of working with Vista Civil Engineering on a challenging Section 278 project, and I must say that their level of expertise and service is second to none. From the initial consultation to the project's completion, their team demonstrated a remarkable commitment to delivering exceptional results.
The project involved the implementation of Section 278 works to a legacy residential estate. Vista were not only highly knowledgeable but also displayed a deep understanding of highway adoption works. Their ability to navigate the con-straints of the project ensured that the works were completed smoothly.
Throughout the project, the team maintained clear and open lines of communication. They were responsive to our questions and concerns and provided regular updates on the project's progress.
The completed highway works met our expectations in terms of functionality, safety, and durability. It's evident that Vista takes pride in their work and is committed to delivering projects that stand the test of time.
I highly recommend Vista to anyone seeking a company that combines exceptional expertise, transparent communica-tion, and a commitment to sustainable and high-quality Section 278 delivery. I look forward to working with them again in the future.”
Mahesh Ganeshan—London Borough of Sutton