Taylor Wimpey

Albert Village, Swadlincote

Project Overview

Construction of a new Section 278 junction, transforming a four-way crossroads into a double-roundabout.The project involved working safely around existing utilities within limited road space. Road closures were restricted to school holidays, and access to local businesses and residences was maintained through traffic management, diversion planning, and stakeholder communication. The works were delivered efficiently, safely, and with minimal disruption to the community.

DELIVERED ON A LUMP SUM, FIXED COST BASIS

CONTINUOUS LIAISONS WITH 100+ RESIDENTS

£0 EXTRAS CHARGED TO THE CLIENT

COLLABORATION WITH ADOPTING AUTHORITY

17 WEEK PROJECT DURATION

IMMEDIATE SIGN-OFF

Certification

MAINTENANCE ACHIEVED 29-09-2022

ADOPTION ACHIEVED 09-05-2024

Works Involved

  • Extensive traffic management including full road closures & diversions through 2 counties.
  • WPD & BT service diversions to facilitate works.
  • Ground investigations to assess structural integrity.
  • Installation of new highway drainage network.
  • Installation of new street lighting network.
  • Installation of new illuminated and reflective signage.
  • Footpath reconstruction and carriageway widening construction.
  • Full carriageway regulating & resurfacing.

BEFORE

AFTER

Site Challenges

Required to work around existing utility services and within the allotted local authority road spaces.


Road closures could only take place within school holidays, due to the vicinity of the junction to a local primary school.


Maintain vehicular and pedestrian access to local businesses and residential properties throughout the works.

Authority Testimonial

Client Testimonial

Vista Civil Engineering constructed our 278 scheme to an excellent standard, achieving immediate sign-off by the Local Council at the same time meeting with the approval of the local community, resulting in the 278 being placed onto maintenance. All works were completed on programme and with no additional costs charged throughout the entire project, which was an amazing result!!

Due to the complex nature of the site, good communication with the various stakeholders was absolutely paramount. As Vista took the lead with all 3rd party liaisons including local residents, adjacent businesses, utility contractors and the local Council, this ensured the project was delivered smoothly with very little time spent using our own resources.

Adoptions Engineer

Taylor Wimpey (North Midlands)

Local Authority Testimonial

Authority Testimonial

“‘I recently had the pleasure of working with Vista Civil Engineering on a challenging Section 278 project, and I must say that their level of expertise and service is second to none. From the initial consultation to the project's completion, their team demonstrated a remarkable commitment to delivering exceptional results.

The project involved the implementation of Section 278 works to a legacy residential estate. Vista were not only highly knowledgeable but also displayed a deep understanding of highway adoption works. Their ability to navigate the con-straints of the project ensured that the works were completed smoothly.

Throughout the project, the team maintained clear and open lines of communication. They were responsive to our questions and concerns and provided regular updates on the project's progress.

The completed highway works met our expectations in terms of functionality, safety, and durability. It's evident that Vista takes pride in their work and is committed to delivering projects that stand the test of time.

I highly recommend Vista to anyone seeking a company that combines exceptional expertise, transparent communica-tion, and a commitment to sustainable and high-quality Section 278 delivery. I look forward to working with them again in the future.”

Mahesh Ganeshan—London Borough of Sutton

Contact

Email
info@vista-civils.co.uk

Phone
0330 165 7989
Office
Vista Civil Engineering
International House
45-55 Commercial Street
London
E1 6BD
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.