Access Construct

WOODBURY STREET, LONDON Woodbury Street

Project Overview

This project involved the coordinated delivery of highway improvement works alongside a busy A-road, including the implementation of comprehensive traffic management measures to maintain safe and efficient movement of both vehicles and pedestrians throughout the duration of the works. The scheme included the removal of existing vehicle crossovers and reconstruction of the footway, installation of a new granite kerb and channel line with a stepped tie-in to the carriageway, and the laying of edging kerbs, flagged and block paving to clearly define the boundary between public and private areas along the building frontage.

DELIVERED ON A LUMP SUM, FIXED COST BASIS

COMPLEX TRAFFIC MANAGEMENT

£0 EXTRAS CHARGED TO THE CLIENT

MAINTENANCE ACHIEVED 27-04-2026IMMEDIATE SIGN-OFF

COLLABORATION WITH ADOPTING AUTHORITY AND CLIENT

2 WEEK PROJECT DURATION

Certification

MAINTENANCE ACHIEVED 27-04-2026

ADOPTION ACHIEVED TBC

Works Involved

• Coordinated and delivered comprehensive traffic management measures alongside a busy A-road.

• Removed the existing vehicle crossovers and footway construction.

• Installation of granite kerb and channel line with a stepped tie-in to the carriageway.

• Laid edging kerbs, flagged and block paving to clearly define the boundary between public and private areas along the building frontage.

• Installation of street furniture, including non-illuminated signage and a street nameplate.

• Resetting of all utility frames and covers within the footway.

• Applied road markings upon completion of the works.

BEFORE

AFTER

Site Challenges

This project involved the coordinated delivery of highway improvement works alongside a busy A-road, including the implementation of comprehensive traffic management measures to maintain safe vehicle and pedestrian movements throughout.

A key consideration throughout the works was maintaining delivery and access arrangements to the building, ensuring continued operational access while works progressed.

Authority Testimonial

Client Testimonial

“Vista completed the Section 278 works on Woodbury Street efficiently, working closely with all stakeholders to maintain programme certainty.

The team demonstrated a clear understanding of the site constraints and delivered the works to a high standard ensuring that sign off was achieved first time.”

Operations Director

Access Construct

Local Authority Testimonial

Authority Testimonial

“‘I recently had the pleasure of working with Vista Civil Engineering on a challenging Section 278 project, and I must say that their level of expertise and service is second to none. From the initial consultation to the project's completion, their team demonstrated a remarkable commitment to delivering exceptional results.

The project involved the implementation of Section 278 works to a legacy residential estate. Vista were not only highly knowledgeable but also displayed a deep understanding of highway adoption works. Their ability to navigate the con-straints of the project ensured that the works were completed smoothly.

Throughout the project, the team maintained clear and open lines of communication. They were responsive to our questions and concerns and provided regular updates on the project's progress.

The completed highway works met our expectations in terms of functionality, safety, and durability. It's evident that Vista takes pride in their work and is committed to delivering projects that stand the test of time.

I highly recommend Vista to anyone seeking a company that combines exceptional expertise, transparent communica-tion, and a commitment to sustainable and high-quality Section 278 delivery. I look forward to working with them again in the future.”

Mahesh Ganeshan—London Borough of Sutton