Bellway Homes & Miller Homes
Greenland Road, Hartlepool

Project Overview
Highway improvement works completed under a road opening permit and approved by Hartlepool Borough Council. The project involved carriageway and footway reconstruction on a narrow, constrained site. Early collaboration with the designer resolved level discrepancies, and unforeseen ground conditions were managed by adjusting the capping layer without impacting the programme. Vista’s consult-and-construct approach ensured first-time approval by the local authority, delivering the project on schedule and removing client liability.
DELIVERED ON A LUMP SUM, FIXED COST BASIS
COMPLEX TRAFFIC MANAGEMENT
£0 EXTRAS CHARGED TO THE CLIENT
COLLABORATION WITH ADOPTING AUTHORITY
4 WEEK PROJECT DURATION
IMMEDIATE SIGN-OFF
Works Involved
- Extensive traffic management implemented, including directional road closure and diversions.
- Resolved design queries to ensure sign off was successfully achieved first time.
- Reconstruction of paved footway including tactile crossing points and kerb lines.
- Resurfacing of cycleway.
- Widening of carriageway approach to roundabout, to increase vehicle stacking.
- Reconstruction of grass verges within road widening area.
- Installation of signage.
- Application of road markings to suit the revised road layout.

BEFORE

AFTER
Site Challenges
Prior to commencing works on site, a level discrepancy was identified during pre-construction surveys. Collaboration with the designer was required to address potential low spots in the carriageway, ensuring a smooth and compliant road surface and preventing delays.
The site presented additional challenges due to its narrow working area, restricting access for machinery and personnel, during footway and carriageway reconstruction. Careful planning and sequencing were essential to maintain safety and efficiency throughout the works.
Unforeseen ground conditions were encountered during construction. By working closely with the design team, the capping layer depth was increased to address these conditions without affecting the programme, allowing the works to be completed within the allocated road space.
Vista’s consult-and-construct approach ensured first-time sign-off by the local authority. The project was delivered on schedule, meeting all technical requirements and successfully removing any potential liability from our client.
Authority Testimonial
Client Testimonial
I would like to thank you and your team for the work carried out on the Powlett Road Roundabout scheme.
It was carried out with professionalism and completed in the agreed timescale.
I am looking forward to working with Vista with next scheme in Hartlepool!
Asset Management Co-ordinator
Hartlepool Borough Council
Local Authority Testimonial
Authority Testimonial
“‘I recently had the pleasure of working with Vista Civil Engineering on a challenging Section 278 project, and I must say that their level of expertise and service is second to none. From the initial consultation to the project's completion, their team demonstrated a remarkable commitment to delivering exceptional results.
The project involved the implementation of Section 278 works to a legacy residential estate. Vista were not only highly knowledgeable but also displayed a deep understanding of highway adoption works. Their ability to navigate the con-straints of the project ensured that the works were completed smoothly.
Throughout the project, the team maintained clear and open lines of communication. They were responsive to our questions and concerns and provided regular updates on the project's progress.
The completed highway works met our expectations in terms of functionality, safety, and durability. It's evident that Vista takes pride in their work and is committed to delivering projects that stand the test of time.
I highly recommend Vista to anyone seeking a company that combines exceptional expertise, transparent communica-tion, and a commitment to sustainable and high-quality Section 278 delivery. I look forward to working with them again in the future.”
Mahesh Ganeshan—London Borough of Sutton
Contact us
Get in touch
Thank you for visiting Vista Civil Engineering. If you would like to contact us directly, please email info@vista-civils.co.uk or
call 0330 165 7989
International House
45-55 Commercial Street
London
E1 6BD