Project Overview

Delivery of a new traffic signal network for Hartlepool Borough Council, improving road safety and traffic flow. The project was on a key Hartlepool arterial route requiring safe and efficient traffic management to maintain pedestrian and vehicle flow. Extensive stakeholder coordination and careful planning enabled road closures, diversions, and works near live utilities. Vista delivered all aspects to a high standard, including a low-voltage mains connection for new traffic signals, achieving first-time acceptance at every milestone.

DELIVERED ON A LUMP SUM, FIXED COST BASIS

CONTINUOUS LIAISONS WITH COMMUNITY

£0 EXTRAS CHARGED TO THE CLIENT

COLLABORATION WITH ADOPTING AUTHORITY

27 WEEK PROJECT DURATION

IMMEDIATE SIGN OFF

Works Involved

  • Extensive traffic management implemented, including directional road closures and diversions.
  • Clearance and removal of trees, grass verge to facilitate footway and carriageway construction, existing highway drainage gullies, street furniture, non-illuminated and illuminated signage, non-illuminated bollards, street lighting columns, and existing road markings.
  • Installation of traffic signal network, including electrical mains connection for feeder pillar, traffic signal control cabinets, duct chambers and associated ducting, loop boxes, and pole retention sockets.
  • Installation of street furniture, including non-illuminated and illuminated signage, non-illuminated bollards, pedestrian guardrails, and street lighting columns.
  • Footway construction and resurfacing works.
  • Carriageway widening, installation of highway gullies, drainage lengths and stepped trench reconstruction.
  • Application of road markings to suit the revised road layout.

BEFORE

AFTER

Site Challenges

Located on a key arterial route into Hartlepool, the works demanded traffic management systems that were safe, efficient and practical, ensuring the continuous movement of both pedestrian and vehicles throughout the programme.


The scheme involved extensive coordination with multiple stakeholders, alongside detailed planning to accommodate the works and enable the required road closures plus diversion routes to be implemented.


Delivery was further complicated by the need to work in close proximity to live utilities, as well as the installation of a low voltage mains connection to support the new traffic signal infrastructure. We provided expertise and constructed all aspects of the project to a high standard which ensured that acceptance of works was achieved first time at each critical milestone.

Local Authority Testimonial

Client Testimonial

AUTHORITY TESTIMONIAL

I can confirm that Hartlepool Council are happy with the works carried out on the A179 / West View Roundabout and there are no remedial works. Please can I extend my thanks and appreciation on how the works were implemented and delivered within the specified time frame. Particularly, due to the tricky location of the site and number of different road closures required.


Traffic & Road Safety Team Leader
Hartlepool Borough Council

CLINET TESTIMONIALS


Vista managed the Section 278 works at West View Roundabout efficiently, working closely with all stakeholders to maintain programme certainty. The team demonstrated a clear understanding of the site constraints and delivered the works efficiently to a high standard.


Engineering Manager
Bellway Homes (Durham)

Local Authority Testimonial

Authority Testimonial

“‘I recently had the pleasure of working with Vista Civil Engineering on a challenging Section 278 project, and I must say that their level of expertise and service is second to none. From the initial consultation to the project's completion, their team demonstrated a remarkable commitment to delivering exceptional results.

The project involved the implementation of Section 278 works to a legacy residential estate. Vista were not only highly knowledgeable but also displayed a deep understanding of highway adoption works. Their ability to navigate the con-straints of the project ensured that the works were completed smoothly.

Throughout the project, the team maintained clear and open lines of communication. They were responsive to our questions and concerns and provided regular updates on the project's progress.

The completed highway works met our expectations in terms of functionality, safety, and durability. It's evident that Vista takes pride in their work and is committed to delivering projects that stand the test of time.

I highly recommend Vista to anyone seeking a company that combines exceptional expertise, transparent communica-tion, and a commitment to sustainable and high-quality Section 278 delivery. I look forward to working with them again in the future.”

Mahesh Ganeshan—London Borough of Sutton

Contact

Get in touch

Thank you for visiting Vista Civil Engineering. If you would like to contact us directly, please email info@vista-civils.co.uk or
call 0330 165 7989
Office
Vista Civil Engineering
International House
45-55 Commercial Street
London
E1 6BD
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.