Bellway Homes

MAIN STREET, FELTON

Project Overview

Complex Section 278 works were required to satisfy a pre-occupation planning condition and were completed to discharge the developer’s obligations.

LIAISONS WITH 160+ RESIDENTS

100%REDUCTION ON INTERNAL RESOURCE

0 EXTRAS CHARGED TO THE CLIENT

COLLABORATION WITH ADOPTING AUTHORITY

£170,000 LUMP SUM, ALL RISK CONTRACT

7 - WEEK PROJECT DURATION

Works Involved

• A new entrance to the development.

• Significant improvements to the adjacent highway network.

• New traffic calming measures.

• Re-surfacing of the main carriageway.

• Improvement works to adjacent junction.

• Traffic management design & applications.

• Lump Sum, Fixed Cost to complete the S278 works.

• Works invoiced upon Local Authority written acceptance.

• Vista acting as Principle Contractor, Main Contractor & developers' Managing Agent.

• Liaisons with the Local Authority & all associated Stakeholders.

BEFORE

AFTER

Site Challenges

As the new development is located on land adjoining the main road leading from the A1 into Felton Village, the programming and coordination of the works, along with the associated traffic management were critical to the successful delivery of this project.


Night-time surfacing of the main carriageway was essential to minimise the disruption to the road network.

Local Authority Testimonial

Client Testimonial

“This scheme required night time works, significant traffic management and extensive engineering supervision and management. As Vista worked on a fixed fee basis, we were able to utilise their consult and construct turn key offering and achieved sign off on the S278 works with ZERO Bellway internal resource used. We've engaged with Vista on a number of schemes, having the ability to offload sites to an outsourced company who take on the hassle and risk is a perfect solution for us!They continue to impress me with their professionalism, quality of workmanship and regular communication. They are very transparent and everything that they promise is delivered on time and to the highest quality."

Technical Director - Bellway Homes

Local Authority Testimonial

Authority Testimonial

“‘I recently had the pleasure of working with Vista Civil Engineering on a challenging Section 278 project, and I must say that their level of expertise and service is second to none. From the initial consultation to the project's completion, their team demonstrated a remarkable commitment to delivering exceptional results.

The project involved the implementation of Section 278 works to a legacy residential estate. Vista were not only highly knowledgeable but also displayed a deep understanding of highway adoption works. Their ability to navigate the con-straints of the project ensured that the works were completed smoothly.

Throughout the project, the team maintained clear and open lines of communication. They were responsive to our questions and concerns and provided regular updates on the project's progress.

The completed highway works met our expectations in terms of functionality, safety, and durability. It's evident that Vista takes pride in their work and is committed to delivering projects that stand the test of time.

I highly recommend Vista to anyone seeking a company that combines exceptional expertise, transparent communica-tion, and a commitment to sustainable and high-quality Section 278 delivery. I look forward to working with them again in the future.”

Mahesh Ganeshan—London Borough of Sutton

Contact

Get in touch

Thank you for visiting Vista Civil Engineering. If you would like to contact us directly, please email info@vista-civils.co.uk or
call 0330 165 7989
Office
Vista Civil Engineering
International House
45-55 Commercial Street
London
E1 6BD
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.